Asphalt Driveway JHB

How Do You Select The Best Driveway or Asphalt Driveway?

Driveway to a farm Driveway apron and sloped curb to a public street, all under construction

A driveway (also called drive in UK English) Asphalt Driveway  in River Club is a type of private road for local access to one or a small group of structures, and is owned and maintained by an individual or group.

Asphalt Driveway Repair Quotes

Driveways rarely have traffic lights, but some that bear heavy traffic, especially those leading to commercial businesses and parks, do.

Driveways may be decorative in ways that public roads cannot, because of their lighter traffic and the willingness of owners to invest in their construction. Driveways are not resurfaced, snow blown or otherwise maintained by governments. They are generally designed to conform to the architecture of connected houses or other buildings.

Asphalt Driveway Paving Price

Some of the materials that can be used for driveways include concrete, decorative brick, cobblestone, block paving, asphalt, gravel, decomposed granite, and surrounded with grass or other ground-cover plants.

Michigan left

Driveway Paving Cost Estimate

Driveways are commonly used as paths to private garages, carports, or houses. On large estates, a driveway may be the road that leads to the house from the public road, possibly with a gate in between. Some driveways divide to serve different homeowners. A driveway may also refer to a small apron of pavement in front of a garage with a curb cut in the sidewalk, sometimes too short to accommodate a car.

Paving Contractors Costs

Often, either by choice or to conform with local regulations, cars are parked in driveways in order to leave streets clear for traffic. Moreover, some jurisdictions prohibit parking or leaving standing any motor vehicle upon any residential lawn area (defined as the property from the front of a residential house, condominium, or cooperative to the street line other than a driveway, walkway, concrete or blacktopped surface parking space).[2] Other examples include the city of Berkeley, California that forbids “any person to park or leave standing, or cause to be parked or left standing any vehicle upon any public street in the City for seventy-two or more consecutive hours.”[3] Other areas may prohibit leaving vehicles on residential streets during certain times (for instance, to accommodate regular street cleaning), necessitating the use of driveways.

Road surface

Asphalt Contractors Near Me

Residential driveways are also used for such things as garage sales, automobile washing and repair, and recreation, notably (in North America) for basketball practice.

Another form of driveway is a ‘Run-Up’, or short piece of land used usually at the front of the property to park a vehicle on.[citation needed]

Interesting Facts About Asphalt Driveway in Boksburg:

About Asphalt Driveway in Boksburg:

Paving Contractors Costs Macadam country road[dubious – discuss]

Macadam is a type of road construction, pioneered by Scottish engineer John Loudon McAdam around 1820, in which single-sized crushed stone layers of small angular stones are placed in shallow lifts and compacted thoroughly. A binding layer of stone dust (crushed stone from the original material) may form; it may also, after rolling, be covered with a binder to keep dust and stones together. The method simplified what had been considered state of the art at that point.

Pierre-Marie-Jérôme Trésaguet is sometimes considered the first person to bring post-Roman science to road building. A Frenchman from an engineering family, he worked paving roads in Paris from 1757 to 1764. As chief engineer of road construction of Limoges, he had opportunity to develop a better and cheaper method of road construction. In 1775, Tresaguet became engineer-general and presented his answer for road improvement in France, which soon became standard practice there.[1]

Trésaguet had recommended a roadway consisting of three layers of stones laid on a crowned subgrade with side ditches for drainage. The first two layers consisted of angular hand-broken aggregate, maximum size 3 inches (7.6 cm), to a depth of about 8 inches (20 cm). The third layer was about 2 inches (5 cm) thick with a maximum aggregate size of 1 inch (2.5 cm).[2] This top level surface permitted a smoother shape and protected the larger stones in the road structure from iron wheels and horse hooves. To keep the running surface level with the countryside, this road was put in a trench, which created drainage problems. These problems were addressed by changes that included digging deep side ditches, making the surface as solid as possible, and constructing the road with a difference in elevation (height) between the two edges, that difference being referred to interchangeably as the road's camber or cross slope.[2]

Laying Telford paving in Aspinwall, Pennsylvania, 1908

Thomas Telford, born in Dumfriesshire Scotland,[3] was a surveyor and engineer who applied Tresaguet's road building theories. In 1801 Telford worked for the British Commission of Highlands Roads and Bridges. He became director of the Holyhead Road Commission between 1815 and 1830. Telford extended Tresaguet's theories, but emphasized high-quality stone. He recognized that some of the road problems of the French could be avoided by using cubical stone blocks.[4]

Telford used roughly 12 in × 10 in × 6 in (30 cm × 25 cm × 15 cm) partially shaped paving stones (pitchers), with a slight flat face on the bottom surface. He turned the other faces more vertically than Tresaguet's method. The longest edge was arranged crossways to the traffic direction, and the joints were broken in the method of conventional brickwork, but with the smallest faces of the pitcher forming the upper and lower surfaces.[4]

Broken stone was wedged into the spaces between the tapered perpendicular faces to provide the layer with good lateral control. Telford kept the natural formation level and used masons to camber the upper surface of the blocks. He placed a 6-inch (15 cm) layer of stone no bigger than 6 cm (2.4 in) on top of the rock foundation. To finish the road surface he covered the stones with a mixture of gravel and broken stone. This structure came to be known as "Telford pitching." Telford's road depended on a resistant structure to prevent water from collecting and corroding the strength of the pavement. Telford raised the pavement structure above ground level whenever possible.

Where the structure could not be raised, Telford drained the area surrounding the roadside. Previous road builders in Britain ignored drainage problems and Telford's rediscovery of these principles was a major contribution to road construction.[5] Though notably of around the same time, John Metcalf was a strong advocate that drainage was in fact an important factor to road construction, and astonished colleagues by building dry roads through marshland. He accomplished this by installing a layer of brushwood and heather.

John Loudon McAdam (1756–1836)[6]

John Loudon McAdam was born in Ayr, Scotland, in 1756. In 1787, he became a trustee of the Ayrshire Turnpike in the Scottish Lowlands and during the next seven years this hobby became an obsession. He moved to Bristol, England, in 1802 and became a Commissioner for Paving in 1806.[7] On 15 January 1816, he was elected Surveyor-General of roads for the Turnpike Trust and was now responsible for 149 miles of road.[7] He then put his ideas about road construction into practice, the first 'macadamised' stretch of road being Marsh Road at Ashton Gate, Bristol.[7] He also began to actively propagate his ideas in two booklets called Remarks (or Observations) on the Present System of Roadmaking, (which ran nine editions between 1816 and 1827) and A Practical Essay on the Scientific Repair and Preservation of Public Roads, published in 1819.[8]

Photograph of macadam road, ca 1850s, Nicolaus, California

McAdam's method was simpler, yet more effective at protecting roadways: he discovered that massive foundations of rock upon rock were unnecessary, and asserted that native soil alone would support the road and traffic upon it, as long as it was covered by a road crust that would protect the soil underneath from water and wear.[9]

Unlike Telford and other road builders of the time, McAdam laid his roads as level as possible. His 30-foot-wide (9.1 m) road required only a rise of 3 inches (7.6 cm) from the edges to the centre. Cambering and elevation of the road above the water table enabled rain water to run off into ditches on either side.[10]

Size of stones was central to the McAdam's road building theory. The lower 20-centimetre (7.9 in) road thickness was restricted to stones no larger than 7.5 centimetres (3.0 in). The upper 5-centimetre (2.0 in) layer of stones was limited to 2 centimetres (0.79 in) size and stones were checked by supervisors who carried scales. A workman could check the stone size himself by seeing if the stone would fit into his mouth. The importance of the 2 cm stone size was that the stones needed to be much smaller than the 10 cm width of the iron carriage tyres that travelled on the road.[5]

McAdam believed that the "proper method" of breaking stones for utility and rapidity was accomplished by people sitting down and using small hammers, breaking the stones so that none of them was larger than six ounces in weight. He also wrote that the quality of the road would depend on how carefully the stones were spread on the surface over a sizeable space, one shovelful at a time.[11]

McAdam directed that no substance that would absorb water and affect the road by frost should be incorporated into the road. Neither was anything to be laid on the clean stone to bind the road. The action of the road traffic would cause the broken stone to combine with its own angles, merging into a level, solid surface that would withstand weather or traffic.[12]

Through his road-building experience, McAdam had learned that a layer of broken angular stones would act as a solid mass and would not require the large stone layer previously used to build roads. Keeping the surface stones smaller than the tyre width made a good running surface for traffic. The small surface stones also provided low stress on the road, so long as it could be kept reasonably dry.[13]

Construction of the first macadamized road in the United States (1823). In the foreground, workers are breaking stones "so as not to exceed 6 ounces [170 g] in weight or to pass a two-inch [5 cm] ring".[14][15][16]

The first macadam road built in the United States was constructed between Hagerstown and Boonsboro, Maryland and was named at the time Boonsborough Turnpike Road. This was the last section of unimproved road between Baltimore on the Chesapeake Bay to Wheeling on the Ohio River. Stagecoaches traveling the Hagerstown to Boonsboro road in the winter took 5 to 7 hours to cover the 10-mile (16 km) stretch.[15][16] This road was completed in 1823, using McAdam's road techniques, except that the finished road was compacted with a cast-iron roller instead of relying on road traffic for compaction.[17][15][16] The second American road built using McAdam principles was the Cumberland Road which was 73 miles (117 km) long and was completed in 1830 after five years of work.[15][16]

McAdam's renown is due to his effective and economical construction, which was a great improvement over the methods used by his generation. He emphasized that roads could be constructed for any kind of traffic, and he helped to alleviate the resentment travelers felt toward increasing traffic on the roads. His legacy lies in his advocacy of effective road maintenance and management. He advocated a central road authority and the trained professional official, who could be paid a salary that would keep him from corruption. This professional could give his entire time to his duties and be held responsible for his actions.[18]

McAdam's road building technology was applied to roads by other engineers. One of these engineers was Richard Edgeworth, who filled the gaps between the surface stones with a mixture of stone dust and water, providing a smoother surface for the increased traffic using the roads.[19] This basic method of construction is sometimes known as water-bound macadam. Although this method required a great deal of manual labour, it resulted in a strong and free-draining pavement. Roads constructed in this manner were described as "macadamized."[19]

New macadam road construction at McRoberts, Kentucky: pouring tar. 1926

With the advent of motor vehicles, dust became a serious problem on macadam roads. The area of low air pressure created under fast-moving vehicles sucked dust from the road surface, creating dust clouds and a gradual unraveling of the road material.[20] This problem was approached by spraying tar on the surface to create tar-bound macadam. On March 13, 1902 in Monaco, a Swiss doctor, Ernest Guglielminetti, came upon the idea of using tar from Monaco's gasworks for binding the dust.[21] Later a mixture of coal tar and ironworks slag, patented by Edgar Purnell Hooley as tarmac, was introduced.

A more durable road surface (modern mixed asphalt pavement) sometimes referred to in the US as blacktop, was introduced in the 1920s. This pavement method mixed the aggregates into the asphalt with the binding material before they were laid. The macadam surface method laid the stone and sand aggregates on the road and then sprayed it with the binding material.[22] While macadam roads have now been resurfaced in most developed countries, some are preserved along stretches of roads such as the United States' National Road.[citation needed]

Because of the historic use of macadam as a road surface, roads in some parts of the United States (as parts of Pennsylvania) are often referred to as macadam, even though they might be made of asphalt or concrete. Similarly, the term "tarmac" is sometimes colloquially misapplied to asphalt roads or aircraft runways.[23]

Asphalt Driveway in Boksburg

Residential Paving Cost Estimate Sealcoating a road on the University of California, Davis campus in 2013.

Sealcoating, or pavement sealing, is the process of applying a protective coating to asphalt-based pavements to provide a layer of protection from the elements: water, oils, and U.V. damage.

Sealcoat or pavement sealer is a coating for asphalt-based pavements. Sealcoating is marketed as a protective coating that extends the life of asphalt pavements. There is not any independent research that proves these claims.

Sealcoating may also reduce the friction or anti-skid properties associated with the exposed aggregates in asphalt.

Not all pavement sealcoat are created equal. For example, refined tar-based sealer offers the best protecting against water penetration and chemical resistance. Asphalt-based sealer typically offers poor protection against environmental chemical and harsher climates (salt water). Petroleum-based sealer offer protection against water and chemicals somewhere between the other two sealers. Another difference between coatings is in terms of wear. Again, refined tar-based sealer offers the best wear characteristics (typically 3–5 years) while asphalt-based sealer may last 1–3 years. Petroleum-based sealer falls between refined tar and asphalt.

There are concerns about pavement sealer polluting the environment after it is abraded from the surface of the pavement. Some states in North America have banned the use of coal tar–based sealants primarily based on United States Geological Survey studies.[1] The industry group that represents sealcoat manufacturers has performed numerous research and reviews of the USGS and have found it to be erroneous, biased (citation and white hat, to name a few) and too generalized in order to draw the conclusions that the United States Geological Survey claims.

There are primarily three types of pavement sealers. They are commonly known as refined tar-based (coal tar based), asphalt-based, and petroleum-based. All three have their advantages but are typically chosen by the contractors’ preference unless otherwise specified.

Prior to application the surface must be completely clean and dry using sweeping methods and/or blowers. If the surface is not clean and dry, then poor adhesion will result. Pavement sealers are applied with either pressurized spray equipment, or self-propelled squeegee machines or by hand with a squeegee. Equipment must have continuous agitation to maintain consistency of the sealcoat mix. The process is typically a two-coat application which requires 24 to 48 hours of curing before vehicles can be allowed back on the surface. Once the surface is properly prepared, then properly mixed sealer will be applied at about 60 square feet per gallon per coat.

The Sealcoating Process

Some studies that suggest that refined tar sealants are a significant contributor to polycyclic aromatic hydrocarbon levels in streams and creek beds and that the continual application of sealcoats may be a significant factor. As a result, a few municipalities in the United States have banned this material.[2] The same studies also suggest that it can be harmful if ingested before curing and ingesting soil or dust contaminated by eroded coal tar sealant.[3] It is also known to have effects on fish and other animals that live in water.

Toll road

Asphalt Driveway Costs Moderate to severe Fatigue cracking.

Crocodile cracking, also called alligator cracking and perhaps misleadingly fatigue cracking, is a common type of distress in asphalt pavement. The following is more closely related to fatigue cracking which is characterized by interconnecting or interlaced cracking in the asphalt layer resembling the hide of a crocodile.[1] Cell sizes can vary in size up to 11.80 inches (300 mm) across, but are typically less than 5.90 inches (150 mm) across. Fatigue cracking is generally a loading failure,[1] but numerous factors can contribute to it. It is often a sign of sub-base failure, poor drainage, or repeated over-loadings. It is important to prevent fatigue cracking, and repair as soon as possible, as advanced cases can be very costly to repair and can lead to formation of potholes or premature pavement failure.

It is usually studied under the transportation section of civil engineering.

Fatigue cracking is an asphalt pavement distress most often instigated by failure of the surface due to traffic loading. However, fatigue cracking can be greatly influenced by environmental and other effects while traffic loading remains the direct cause. Frequently, overloading happens because the base or subbase inadequately support the surface layer and subsequently cannot handle loads that it would normally endure.[2] There are many ways that the subbase or base can be weakened.

Poor drainage in the road bed is a frequent cause of this degradation of the base or subgrade.[1] A heavy spring thaw, similarly to poor drainage, can weaken the base course, leading to fatigue cracking.[1]

Stripping or raveling is another possible cause of fatigue cracking. Stripping occurs when poor adhesion between asphalt and aggregate allows the aggregate at the surface to dislodge. If left uncorrected, this reduces the thickness of the pavement, reducing the affected portion's ability to carry its designed loading.[1] This can cause fatigue cracking to develop rapidly, as overloading will happen with loads of less magnitude or frequency.

Edge cracking is the formation of crescent-shaped cracks near the edge of a road.[3] It is caused by lack of support of the road edge, sometimes due to poorly drained or weak shoulders. If left untreated, additional cracks will form until it resembles fatigue cracking.[3] Like wheel-path fatigue cracking, poor drainage is a main cause of edge cracking, as it weakens the base, which hastens the deterioration of the pavement.[4] Water ponding (a buildup of water which can also be called puddling) happens more frequently near the edge than in the center of the road path, as roads are usually sloped to prevent in-lane ponding. This leads to excess moisture in the shoulders and subbase at the road edge. Edge cracking differs from fatigue cracking in that the cracks form from the top down, where fatigue cracks usually start at the bottom and propagate to the surface.

Fatigue cracking manifests itself initially as longitudinal cracking (cracks along the direction of the flow of traffic) in the top layer of the asphalt.[5] These cracks are initially thin and sparsely distributed. If further deterioration is allowed, these longitudinal cracks are connected by transverse cracks to form sharp sided, prismatic pieces. This interlaced cracking pattern resembles the scales on the back of a crocodile or alligator, hence the nickname, crocodile cracking.

More severe cases involve pumping of fines, spalling, and loose pieces of pavement. The most severe cases of fatigue cracking often occur with other pavement distresses, but are exemplified by: potholes,[1] large cracks(3/8" or larger), and severely spalled edges.[4]

There are many different ways to measure fatigue cracking, but in general a pavement distress manual or index will be used. For example, the Pavement Condition Index is widely used to quantify the overall level of distress and condition of a section of road. Measurement of fatigue cracking specifically (and pavement distress in general) is necessary to determine the overall condition of a road, and for determination of a time-line for rehabilitation and/or repair. There are many other rating systems, and many rating systems currently in use are based on the AASHO Road Test.

There are two important criteria to take into account when measuring fatigue cracking. The first is the extent of the cracking. This is the amount of road surface area which is affected by this pavement distress. The second criterion is the severity of the cracking.[6] Severity, which has been discussed above, refers to how far the cracking has progressed, and is often directly a function of crack width.[6] Severity may be rated numerically, or given a rating from "low" to "severe". The rating may be entered into a pavement management system, which will suggest a priority and method for the repair.

Systems have been developed that detect fatigue cracking and other types of pavement distress automatically.[7] They measure the severity and frequency of alligator cracking on the road-path. One such machine is the road surface profilometer, which is mounted on a vehicle and measures the profile of the road surface while it is moving down the roadway.

Preventing fatigue cracking can be as simple as preventing the common causes. For example, reducing overloading on an asphalt pavement or improving drainage[2] can prevent fatigue cracking in many cases. Prevention primarily depends on designing and constructing the pavement and subbase to support the expected traffic loads, and providing good drainage to keep water out of the subbase.

A good strategy to prevent overloading, which is a main cause of fatigue cracking, is to increase the depth of the asphalt layer. According to certain researchers, pavements that exceed a certain minimum strength or thickness can hypothetically handle infinitely many loads without showing structural defects, including fatigue cracking.[1] These pavements are called perpetual pavements or long-term performance pavements (LTPP).

When repairing pavement affected by fatigue cracking, the main cause of the distress should be determined. However, often the specific cause is fairly difficult to determine, and prevention is therefore correspondingly difficult. Any investigation should involve digging a pit or coring the pavement and subbase to determine the pavement's structural makeup as well as determining whether or not subsurface moisture is a contributing factor.[1] The repair needed also differs based on the severity and extent of the cracking.

In the early stages, sealing cracks with crack sealant limits further deterioration of the subgrade due to moisture penetration. Small areas may be repaired by removal of the affected area, and replacement with new base and asphalt surface.[2] Once the damage has progressed or the affected area is large and extensive, a structural asphalt overlay or complete reconstruction is necessary to ensure structural integrity. Proper repair may include first sealing cracks with crack sealant, installing paving fabric over a tack coat, or milling the damaged asphalt. An overlay of hot mix asphalt is then placed over the completed repair. [2]

Asphalt Surfacing Company Cost Estimate